WebSep 1, 2024 · Q: A small hydraulic excavator will be used to dig a trench in hard clay (bucket fill factor = 0.80). The minimum trench size is 26 in. (0.66 m) wide by 5 ft (1.53 … WebA small hydraulic excavator will be used to dig a trench in hard clay (bucket fill factor = 0.80). The minimum trench size is 0.6 m wide by 3.0 m deep. The excavator bucket …
Buckets - Volvo Construction Equipment
WebA CAT 315 Excavator with a 1.5 cubic yard bucket is excavating and side casting. If you are working 51 minutes per hour, determine the production achieved in BCY/Hr. Assume that the excavator has a basic cycle time of 36 seconds. The material being excavated has a swell factor of 1.2 and a bucket fill factor of 0.80. 2. If the excavator WebThe software programs provide cut and fill calculations using several different methods. This might include the grid method, the triangular prisms method, the cross-section method, … erwin camping
COST AND PRODUCTIVITY ANALYSIS OF EQUIPMENTS FOR …
WebThe material is sand and gravel with a bucket fill factor of 0.95. Job efficiency is 46 min/h. Average depth of cut is 2.5 m. Maximum depth of cut is 5.0 m and average swing is 90 degrees. Find the expected production in loose cubic meters (LCM) per hour of a large hydraulic excavator. Heaped bucket capacity is 2.05 m3. WebThe bucket size required to handle the required volume per cycle is found with the aid of the percentage of rated bucket capacity, called bucket fill factor. The bucket size needed is determined by dividing loose cubic yards (cubic meters) required per cycle by the bucket fill factor. The basic bucket fill factor formula is: WebWeight: 230.2t – Transport length: 7.52m – Transport width: 6.04m – Transport height: 6.92m – Bucket capacity: 12m³ – Track width: 1000mm. Check out detailed specifications, information and technical data for Caterpillar 6020B excavator manufactured between 2024 - 2024. Get more in-depth insight with Caterpillar 6020B digger ... erwin cancer